The Radius Subterra Solution
- Innovative Liner System: Radius Subterra re-engineered and extended its folded close-fit PE liner system to rehabilitate the 2.3-kilometre-long, large-diameter water supply trunk main. This approach avoided the high costs and disruption of traditional relaying methods.
- Rapid Insertion and Restoration: The careful preparation and rapid insertion of the liner allowed the pipeline to be restored in less than two days, maintaining bulk supply reserves and preventing critical service disruptions.